Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a fully engineered ventilation and climate control system designed to satisfy stringent hygiene and production requirements. The project encompassed the design, supply, installation and commissioning of advanced HVAC systems across non-production, Medium Care (MC) and High Care https://bookmarktiger.com/story20607499/penmann-completes-major-hvac-upgrade-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2