The MCBs need to be clipped on to the Din bar and the busbar right into a existing flowing terminal and restricted screwed to offer present-day to your MCBs.Two sixteen/25mm tail cables, one neutral and the opposite Energetic are connected to the most crucial double pole switch on the meter. https://whatisaneicrreport12110.isblog.net/detailed-notes-on-outdoor-power-socket-installation-52470546